Image above shows the once proud and economically supportive Herring River on Cape Cod, being forced to "breath through a straw" with grossly undersized culverts, for 100 years. Social influences diked this 1,200 acre river system and social influences will be required to give this river back it's voice. Gordon Peabody, Wellfleet MA August 2012
Click HERE for Restoration Planning Documents
Click HERE for the NEW Herring River Restoration Committee
Click HERE for Learning From Australia's Estuaries
HRTC_CRP_COVER_LTR
Click on the following links for the most recent update on the Wellfleet Herring River Restoration:
http://www.capecodtimes.com/article/20141201/NEWS/141209992/0/SEARCH
http://www.capecodtimes.com/article/20150204/NEWS/150209663/0/SEARCH
_________________________________________
UPDATE AUGUST 2012:
The largest proposed salt marsh restoration project on the North Atlantic Coast has just been updated. Read the excerpt from Department of Environmental Resources' latest Newsletter posted below. Safe Harbor supports salt marsh restoration. Safe Harbor Director Gordon Peabody was Chair of the Herring River Technical Committee which reviewed all previous technical information regarding the river and developed the Conceptual Restoration Plan. More information regarding development of that plan can be found elsewhere on this page.
DER Coastal Projects Update
Herring River, Wellfleet
Aerial view (looking north) of a portion of the Herring River Estuary in Wellfleet. The dike, acting as the main source of restricting tidal flow to the estuary, is in the foreground.
The Draft Environmental Impact Statement/Report for this large-scale restoration project, which would restore tidal flow to an approximately 1,000 acre area in and along the Herring River estuary, is scheduled to be released in October, and public informational meetings about, and a comment period on, the project are expected to be scheduled shortly thereafter. This is the largest tidal estuary restoration ever undertaken in Massachusetts and the North Atlantic coast of the United States. DER has served as a core project partner over the past decade and has contributed substantial technical and financial resources to support project development.
In the meantime, the Friends of Herring River have produced Return of the Tides: The Herring River Restoration Project, a video developed to educate the public about the value of a healthy salt marsh estuary and the expected benefits or restoring the historic tidal flow of the Herring River Estuary. For thousands of years, this estuary was highly productive and provided feeding and nursery habitat for commercially important fish and shellfish, cycled nutrients and sediment to improve water quality, produced salt hay for animal fodder, and buffered storm surges. Then, throughout the nineteenth and early twentieth centuries, road and railroad dikes were built across the river’s floodplain, bisecting the salt marshes and dramatically altering natural tidal patterns. In addition to the group’s website, Return of the Tides may also be viewed on Vimeo and (with subtitles) on an electronic bulletin board at the Beach Sticker Office in Wellfleet. [Click here and here for additional info on this project.]
`·.¸¸.·´¯`·.¸.·´¯`·..><((((º>`
_____________________________________
Diked for 99 years, the natural resources of Wellfleet's Herring River may get a second chance.
The diked Herring River estuary in Wellfleet, Massachusetts is being considered for restoration. Nearly 100 years ago, the 1,200 acre salt marsh system was reduced to 7 acres. Upper reaches of historic Cape Cod tidelands stretch four miles North into the town of Truro. During the past 100 years, the ecological values of the salt marsh have degraded. Upland vegetation began invading the flood plain. Lack of flushing contributed to low levels of dissolved oxygen. Acidic conditions supported mosquitoes and high levels of bacteria. Fish kills and routine closures of adjacent shellfish beds eventually received attention. In August of 2005, a Memorandum of Understanding (MOU), between the town of Wellfleet and the Cape Cod National Seashore, detailed the process for considering restoration.
A Stakeholder Committee was appointed, to solicit local concerns about potential restoration. A Technical Committee was formed to study the existing scientific information available on the Herring River's existing conditions. The Technical Committee was also directed to respond to Stakeholder issues and make a recommendation on the feasibility of restoration to the Wellfleet Board of Selectmen. In January, 2006, the Wellfleet Board of Selectmen reviewed the Full Report of the Technical Committee.
The Technical Committee's report recommended "that tidal restoration of the Herring River Salt Marsh is feasible and will provide numerous and substantial public benefits" The recommendation continued, "....significant improvements in water quality would provide subsequent public health, recreational, environmental and economic benefits.". Specifically included was "a new structure capable of full tidal restoration....incorporating controlled gates to provide incremental increases in tidal exchange. This would allow for well thought out management, supervision, monitoring and evaluation."
The Selectmen discussed the Committee's recommendation and voted unanimous approval. According to the MOU, the Herring River Technical Committee (HRTC) was now responsible for developing a Restoration Plan. The Committee began meeting again in February. One of the first orders of business was to establish eleven and eventually 14 sub committees, cataloging issues relevant to the Restoration.
This map identifies roadway culverts we are studying, in the flood plain.
This map depicts some of the earliest records of the Herring River estuary system.
A brush meadow in the diked river's flood plain. Upland vegetation has intruded into salt marsh habitat.
The expected future vista of the previous brush meadow photo. Careful management and planning will allow for removal of vegetation before it is killed by salt water. Sun light must be able to reach the marsh surface for restoration to be possible.
Members of the Herring River Technical Committee
In the foreground: Hillary Greenberg, Wellfleet Health and Conservation Agent; Joel Fox, Aquaculturist. In the background are three representatives from the consulting firm of ENSR, who are working with the HRTC. From left to right, Mike Ball, ecologist; Dennis Lowrey, wetlands ecologist; Firooz Pannah, bridge engineer. Eric Derleth and Stephen Spear are HRTC members. Joel Fox; Carl Breivogal, Wellfleet Herring Warden; Stephen Spear, Natural Resources Conservation Service, USDA; Steve Block, NOAA Restoration Center. Eric Derleth, U.S. Fish and Wildlife Service; Tim Smith, MA Coastal Zone Management; Jack Whelan, Chequessett Yacht and Country Club (CYCC is involved in restoration land). In the background are members of the public, who are always invited to attend our meetings. Robert Hubby (vice chair) Wellfleet Open Space Committee; Diane Murphy, Cape Cod Cooperative Extension Service; John Portnoy, Senior Ecologist, Cape Cod National Seashore. John Riehl, Wellfleet Natural Resources Advisory Board; Gordon Peabody (chair). Members absent Gary Palmer, Truro Board of Selectmen; Andy Koch, Wellfleet Shellfish Department. Peter Watts, (chair) Herring River Stakeholders Committee.Sub Committee Reports
As of December. 2006, 13 of the HRTC's 14 sub committee's have reported back to the full Committee and 12 final reports have been accepted. These sub com reports contain information that will contribute to the restoration plan.
1. Vegetation Management Issues (approved August, 2006). Study of vegetation volumes, types and locations within the flood plain. Woody stemmed, intrusive upland vegetation will need a careful management plan, for removal prior to being killed by salt water. If the restoration were done in an incremental manner, vegetation could be removed sequentially. Approximately 600 acres of vegetation may require management effort. Various methods and techniques were presented. Options for disposal included: cut and sold as biomass for fuel; cut and burned on site; allowed to naturally transition (in the case of some reedy vegetation). Members: Joel Fox; Stephen Spear; Carl Breivogel; Gordon Peabody. 2. Stakeholder Issues (presented August, 2006). Just over sixty questions were gathered from residents, abutters and the Stakeholders Committee. Questions of a technical nature were answered prior to the early January, 2006 Wellfleet Selectmen's meeting. Questions regarding restoration management were answered as the HRTC began studying planning issues. Members: Robert Hubby; John Riehl. 3. Education Issues (approved August, 2006). The restoration provides a unique opportunity to share "real time" educational material. Teaching and learning concepts, from digital to on site and techniques from newsletters to a "restoration trail" were presented. Members: Robert Hubby; John Portnoy; Gordon Peabody.
4. Migration Issues (approved September, 2006). Multi species, anadromous and catadromous migrations were researched. Critical migration time windows were determined. Members: Andy Koch; Diane Murphy; Carl Breivogel.
5. Budget and Grants (approved October, 2006). Outlines potential budget issues, funding sources and grant timelines. Members: Tim Smith; John Portnoy; Stephen Spear; John Riehl. 6. Permitting Issues (approved October, 2006). Catalogues sequence of overall, multi-tiered permitting matrix, between federal, state and local agencies. Members: Hillary Greenberg; Tim Smith; John Portnoy. 7. Monitoring Issues (approved September, 2006). Provides catalogue of potential bio-indicators, parameters, protocols and sites for monitoring. Members: Diane Murphy, Andy Koch; Carl Breivogel; Gordon Peabody. 8. Restoration Histories, Lessons to be Learned (approved October, 2006). A study of New England's previous salt marsh restorations. Focus was on the nearby Hatches Harbor Restoration which provides a model for elements of our restoration plan. Common restoration problems were described. members: Tim Smith; Stephen Spear; Gordon Peabody.
9. Liaison (approved September, 2006). A catalogue of restoration partners with common interests (ecological, social, educational, administrative, financial and physical) in the restoration process. Members: John Riehl; Gordon Peabody.
10. Archives (approved October, 2006). Catalogue defining documents, electronic and hard copy, to be included in Public Record. Includes protocol for "Management and Disposition of Electronic Mail". Members: Robert Hubby; Gordon Peabody.
11. Outreach (approved October, 2006). Outlines protocol for volunteer program to be conducted through Association for the Preservation of Cape Cod (APCC), to conduct salinity monitoring. Members: John Riehl; John Portnoy. 12. Access (approved October, 2006). Catalogue of issues related to restoration area use, including shell fishing, fishing, boating, hiking and necessary support for such activities. Members: John Riehl; Gordon Peabody.
13. Restoration Impacts (interim report presented October, 2006). On going investigation of property, abutters, structures and road ways, which could be potentially impacted by restoration. Members: Jack Whelan; John Portnoy; Joel Fox; Gordon Peabody. 14. Administration (in process). Developing definitions of membership and responsibility for the future "Over Sight" Committee, which will implement restoration. Members: John Riehl; Robert Hubby; Hillary Greenberg; John Portnoy; Gordon Peabody.
Working Groups were appointed, during the fall of 2006, to work on shorter term issues. "Working groups" may include participants outside of the Committee membership when necessary. These groups provide regular reports to and receive direction from, the full Committee.
1. Brochure. The Wellfleet Conservation Trust contributed $2,000 to sponsor an informational brochure describing the restoration effort. MA Coastal Zone Management contributed formatting and layout and MA Corporate Wetlands Partnership contributed $500 to cover additional printing costs. The brochure is currently available on the Outer Cape and by request (at no cost) from gordonsafeharbor@yahoo.com. Members: Tim Smith; John Portnoy; Stephen Spear; Gordon Peabody; Peter Hall, Wellfleet Conservation Trust; Dennis O'Connell, Wellfleet Conservation Trust.
2. Newsletter. The HRTC is creating a semi-monthly newsletter, to continue the outreach information stream initiated by the brochure. Members: John Portnoy; Tim Smith; Stephen Spear; Gordon Peabody.
3. Mosquitoes and Drainage. Working to develop a comprehensive, integrated, management plan to define healthy marsh habitat as a function of tidal flushing. Members: John Portnoy; Stephen Spear; Gordon Peabody; Gary Palmer; Gabrielle Sakolsky (Cape Cod Mosquito Control Program or CCMCP). This Working Group's final report (4th revision) was unanimously approved at the 3/19/07 HRTC meeting. This report is available on the CURRENT DOCUMENTS page
4. Low Lying Roadways. New Working Group appointed 3/19/07. Reviewing overflight and ground based data from ENSR consultants to determine specific areas of roads within the flood plain, paved and unpaved, which could eventually be impacted by incremental restoration. Working Group includes Town of Wellfleet DPW, John Riehl, and others to be named at 4/12/07 HRTC meeting. Town of Truro DPW will also be invited to the April 12 meeting.
5. By Pass Working Group. Newly appointed members will more formally research and act as liaison between the HRTC and Public Safety officials regarding use of a by pass during construction work at the Chequessett Neck dike. High Toss Road is being considered. This could save nearly a million dollars for the restoration project in construction delays and savings if a "by pass" was feasible. This might include widening turns, some grading and brush cutting and locating a water tank somewhere on the West side of the Herring River for fire emergencies. This tank would need to be underground because dike reconstruction would need to occur in winter due to numerous considerations such as human and migratory fish traffic.
5. Second Memorandum of Understanding (MOU II). The restoration of the Herring River needs to be coordinated between Federal (Cape Cod National Seashore or CCNS) and Local (towns of Truro and Wellfleet) entities. These critical, inter-governmental relationships need to be defined in a document referred to as a "memorandum of understanding". This MOU needs to determine the roles and responsibilities of the three entities. Members: Gary Palmer, Truro Board of Selectmen (and HRTC); Rex Peterson, Wellfleet Assistant Town Administrator; John Portnoy, CCNS (and HRTC); Carrie Phillips, CCNS Natural Resources Director; Hillary Greenberg, Town of Wellfleet Health and Conservation (and HRTC); Gordon Peabody HRTC .
MOU II Working Group is meeting every two weeks. Meeting locations are intentionally alternated, between Cape Cod National Seashore Headquarters and town halls in Truro and Wellfleet. From left: Hillary Greenberg; Rex Peterson; John Portnoy; Gary palmer; Carrie Phillips; Gordon PeabodyWant More Information?
1. Numerous additional documents are available upon request. Please contact Gordon Peabody at 508-237-3724 or click here gordonsafeharbor@yahoo.com
2. For access to most recent documents, such as agendas, draft plans, minutes and chairman's notes, go to the CURRENT DOCUMENTS page, at the very top of this page.
3. Restoration Brochure, background and general information. Just click on the link below to read the brochure.
Herring River Restoration Project Brochure